Thursday, July 30, 2009
Friday, July 24, 2009
Video
This is a video of the strobe run of the turbine. Pressure did not exceed 25psi. We noticed issues with the strobes we had. The Strobotac was much different than a second newer design showing us that the strobes needed to be calibrated. On monday we plan on talking to a professor who should have a calibrated one.
Thursday, July 23, 2009
Milling
Obtained a 25,000RPM strobe since our newer model was capped at 12,500RPM. Also started milling the air circle introduction slope.
Wednesday, July 22, 2009
Trimmed nozzle blanks
Tuesday, July 21, 2009
Calculations, RPM vs Torque
Monday, July 20, 2009
Thursday, July 16, 2009
Meeting update
An earlier meeting with Roberts was held today to discuss the two additional nozzles. Friday's meeting was canceled.
Wednesday, July 15, 2009
Adapter
Test 2
Created new shaft with larger barrel dimension. Ran 2nd test and achieved approximatly 20% increase in RPM output due to smoothed disk OD.
Monday, July 13, 2009
Bearings, shaft install